Announcement: Trails within the Shei-Pa National Park Ecological Protection Area will reopen from 00:00 am on October12, 2024.
Post Date:2024-10-11
Released by:Shei-pa National Park Headquarters
⛰ Current Status of Mountain Routes:
✅ Main Peak of Xue Mountain Route
✅ Wuling Quadruple Mountains Route
✅ Daba Peaks Route
✅ Zhijiayang Route
✅ Xuejian Route
✅ West Xue Trail
✅ Shengleng Trail (Holy Ridge Trail)
✅ North Ridge of Daba Peaks Route
⚠️ Trail Conditions:
❗️ Daba Peaks Route: The new rockfall at 5.2 km of the East Branch of Dalu Forest Road has been cleared. Please pass through quickly and avoid lingering.
❗️ Zhijiayang Route: The access road in front of Shima Farm has been repaired; however, please remain cautious of falling rocks along the slopes when passing through.
⚠️ Road Conditions:
❗️ Slope stabilization work is currently underway at 27.2 km of Provincial Highway 7A (Nanshan Section). From September 30th to October 31st, 2024, traffic will be controlled between 9:00 AM and 5:00 PM daily, with a 30-minute closure followed by a 5-minute opening."
❗️ Please drive cautiously and maintain a safe distance when passing through the Mimodeng section (km 36.6 to 36.8) of Provincial Highway 7A, as the slope is prone to rockfalls.(There will be no special construction restrictions on holidays.)
👉 Following the typhoon, hikers should remain vigilant of potential heavy rain in the mountainous regions. To ensure safety, they must observe environmental conditions upon entering the park. If any landslides or hazardous road conditions are encountered, immediate retreat and reporting of such conditions are essential for facilitating disaster relief efforts.